Case Study

Diamond Wire for Allied Infrastructure

Client

Network Rail

Project

Newton-Le-Willows Station enhancement programme

Industry

Construction

Overview

Newton-Le-Willows station near Warrington was built in 1845 and is undergoing an £18m revamp. A subway is also being dug to link the station to the platform on the other side of the tracks.

The team is mining underneath the tracks to create the subway, while trains continue to rattle above them. The line has been kept fully operational while works are ongoing and has required the team to do some complex engineering in order to ensure no damage is done to the historic route or the original listed ticket office.

The Solution

Diaquip wire was used to form section cuts to Steel Grout Filled Piles that have been used to form the canopy of the tunnel 600mm g tubes x 750mm long sections, weighing approx. 500 Kg each 26 either side so 52 Nr. The Piles were installed horizontally under the line to act as temp works/support to the formation of the tunnel.

More projects

Diamond Wire Supply for Mooring Chain Cutting (ROV / Offshore) for Mactech Offshore USA

DQ7 Precision Cutting for Renewable Energy Recycling

DQ5 Diamond Wire Sawing Project for Apex Hotel, Bath

Diamond Wire Supply for Mooring Chain Cutting (ROV / Offshore) for Mactech Offshore USA

DQ7 Precision Cutting for Renewable Energy Recycling

Let's work together

Speak to our expert team about how Diaquip can assist with your next project.